Skip to main navigation Skip to search Skip to main content

Performance Evaluation and Crack Repair in Building Infrastructure

Research output: Contribution to journalConference articlepeer-review

Abstract

The implementation of building infrastructure development to improve people's lives is important. The use of reinforced concrete structures has increased very rapidly. But many buildings are failed and are not safe because of overloading, changes in function and configuration of buildings, poor maintenance, and natural disasters. Many methods developed to reduce the damage caused by earthquakes so that the development of methods to strengthen and repair building structures is needed to anticipate damage to buildings. This study focuses on beam-column joint cracks with simple building characteristics, column size 20/20 and beam 15/20 (monolithic) with concrete quality fc'= 21 MPa, so it is necessary to evaluate and repair beam-column joint cracks in buildings because of overload. The method used was experimental and testing in a laboratory with a single static load and Ultrasonic Pulse Velocity (UPV) test to determine the density after repair. Test specimens are SK (control-specimens) and SK-repairing. The results showed that the beam-column joint performance before and after repairs had relatively the same flexural strength of 1,669 kg and 1,686 kg, while the stiffness was lower at 14.48%. The velocity after repair average is 3,327.5 m/s (medium-category). The elasticity average modulus of the test is 20.43 GPa.

Original languageEnglish
Article number012007
JournalIOP Conference Series: Earth and Environmental Science
Volume328
Issue number1
DOIs
Publication statusPublished - 24 Oct 2019
Event4th International Conference in Planning in the 2019 Era of Uncertainty, ICPEU 2019 - Malang City, Indonesia
Duration: 12 Mar 201913 Mar 2019

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 11 - Sustainable Cities and Communities
    SDG 11 Sustainable Cities and Communities

Keywords

  • beam-column joints
  • buildings
  • cracks
  • repairs
  • UPV

Fingerprint

Dive into the research topics of 'Performance Evaluation and Crack Repair in Building Infrastructure'. Together they form a unique fingerprint.

Cite this