Monte Carlo Mathematical Model Simulation: An Evaluation of The Probability of Construction Project Acceleration

  • R. Alfandi Rizki Pratama*
  • , Ludfi Djakfar
  • , Kartika Puspa Negara
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

Complex projects such as road infrastructure require reliability and risk analysis for safety and economic sustainability. This study divides the concept of comprehensive risk identification into several variables with several indicators. Indicators refer to findings that occur in the field during acceleration. The simulation was conducted with the help of the @Risk program in Microsoft Excel using standard settings, and the distribution used was triangular. The population in this study is all project stakeholders related to determining the implementation time of the Djuanda FO construction, which is currently underway in the 46th week. The population consisted of 22 experts who were involved in scheduling the FO Djuanda construction project. Since the population size is limited in the study, all population members were sampled. The sampling technique is census or saturated sampling, in which all population members are used as samples. The respondents asked to complete a questionnaire and answer questions about implementing the FO Djuanda development project. Sampling is limited to top management with expertise in decision-making to determine the duration of project implementation in scheduling. This study obtained interval data, with interval data in the form of a Likert scale (scale 1– 5). Based on the research results, risk evaluation can be adopted well through Monte Carlo mathematical model simulation. The risks in the acceleration of the FO Djuanda development project, based on the order of risk levels from the largest to the smallest, are direct costs, work calendar schedule, logistics, external, field constraints, health and safety, indirect costs, community relations, environment, construction contracts, traffic, and construction.

Original languageEnglish
Pages (from-to)644-657
Number of pages14
JournalJournal of Multidisciplinary Applied Natural Science
Volume5
Issue number2
DOIs
Publication statusPublished - 31 May 2025

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure
  2. SDG 17 - Partnerships for the Goals
    SDG 17 Partnerships for the Goals

Keywords

  • Monte Carlo simulation
  • probability
  • project acceleration
  • the Djuanda flyover construction

Fingerprint

Dive into the research topics of 'Monte Carlo Mathematical Model Simulation: An Evaluation of The Probability of Construction Project Acceleration'. Together they form a unique fingerprint.

Cite this