Skip to main navigation Skip to search Skip to main content

Facility Layout Improvement in Shipyard Support Industries with Systematic Layout Planning to Increase Productivity

  • Dwisetiono
  • , Marjono
  • , Wike
  • , Slamet Wahyudi
  • , Iradiratu Diah Prahmana Karyatanti

Research output: Contribution to journal › Article › peer-review

Abstract

Material handling is about availability, movement, and control of material at the right amount, condition, time, sequence, and place. PT. Dua Sahabat Group is a company that is included in the shipbuilding support industry, where currently there is inefficiency in material handling in terms of the layout of production facilities. One of the efforts to increase productivity at PT. Dua Sahabat Group is by reducing the material path distance in the production process, especially for three products, namely ship steel doors, ship cabin doors and ship windows. This study discusses re-planning the layout of production facilities at PT Dua Sahabat Group by using the Systematic Layout Planning (SLP) method. The significance of the research is that the resulting facility layout provides solutions for material movement to support smooth production by shortening the distance between work stations, which means shortening production time and saving costs. The SLP approach has resulted in a decrease in the production line distance of 70.3% for the ship's steel door, 68.4% for the ship's cabin door, and 73.0% for the ship's window.

Original languageEnglish
Pages (from-to)249-258
Number of pages10
JournalInternational Journal on Engineering Applications
Volume11
Issue number4
DOIs
Publication statusPublished - 2023

Keywords

  • Layout
  • Material Handling
  • Production Facilities
  • Shipbuilding Support Industry
  • SLP

Fingerprint

Dive into the research topics of 'Facility Layout Improvement in Shipyard Support Industries with Systematic Layout Planning to Increase Productivity'. Together they form a unique fingerprint.

Cite this