Skip to main navigation Skip to search Skip to main content

Dominant factors in the implementation of Total Quality Management (TQM) in contractors

Research output: Contribution to journal › Conference article › peer-review

Abstract

The Total Quality Management (TQM) was considered as one of the most essential approaches in enhancing the output quality of organizations or companies in the construction industry. While there have been numerous studies on TQM in the construction sector, this study consolidates the core variables from previous research and adds to the existing body of knowledge. This study also examines the implementation of TQM in Moluccas, a region that has not been previously studied. The dominant factor in the implementation of TQM in contractors in Moluccas is leadership as the main factor (RII 0.700). Strong leadership with a clear vision drives continuous quality improvement. The second factor is communication (RII 0.674), which emphasizes the importance of delivering fast and accurate information. Teamwork (RII 0.672) and process management (RII 0.662) also play a significant role in maintaining project quality. Other factors are organizational culture, focus on customer satisfaction, supplier management, and continuous improvement. Although continuous improvement has the lowest RII (0.590), this practice is still important for long-term quality sustainability.

Original languageEnglish
Article number012082
JournalIOP Conference Series: Earth and Environmental Science
Volume1488
Issue number1
DOIs
Publication statusPublished - 2025
Event8th International Conference on Eco Engineering Development, ICEED 2024 - Semarang, Indonesia
Duration: 6 Nov 2024 → 7 Nov 2024

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 12 - Responsible Consumption and Production
    SDG 12 Responsible Consumption and Production

Keywords

  • Contractors
  • Relative Importance Index
  • Total Quality Management

Fingerprint

Dive into the research topics of 'Dominant factors in the implementation of Total Quality Management (TQM) in contractors'. Together they form a unique fingerprint.

Cite this