Skip to main navigation Skip to search Skip to main content

Dam Break Analysis of Gembong Dam Using Zhong Xing HY21

Research output: Contribution to journalConference articlepeer-review

Abstract

Dams are a form of effort to conserve or protect water resources. The function of the Dam as a reservoir for water, irrigation, power generation, and flood control. However, in addition to its huge benefits, dam construction also can endanger the community's safety, namely in the form of dam breaks. The main causes of dam break are overtopping and piping. So that analysis is needed related to dam break to minimize the impact. Based on the Zhong Xing HY21 software, the most severe impact of the break of the Gembong Dam was due to overtopping using the QInflow PMF design flood of 724.142 m3/s. It resulted in an inundation area of 54.682 km2 with a maximum inundation height of 5.129 m. As a result of the break of the Gembong Dam, 37 villages downstream of the Gembong Dam were flooded. There are 80.819 people affected by this risk. It is stated that all affected villages are at the 4th hazard classification level or very high hazard.

Original languageEnglish
Article number012091
JournalIOP Conference Series: Earth and Environmental Science
Volume930
Issue number1
DOIs
Publication statusPublished - 14 Dec 2021
Event4th International Conference of Water Resources Development and Environmental Protection, ICWRDEP 2021 - Malang, Virtual, Indonesia
Duration: 7 Aug 2021 → …

Keywords

  • Gembong Dam
  • overtopping
  • piping
  • Zhong xing HY21

Fingerprint

Dive into the research topics of 'Dam Break Analysis of Gembong Dam Using Zhong Xing HY21'. Together they form a unique fingerprint.

Cite this